Start the battle of pollution prevention and control so that "a river of clean water around the city" now Jiangning
Release time:2019-09-30 Views:163
Where to go on National Day? To Yangjiawei Cultural leisure Park to watch a film, or to the Qinhuai River boardwalk, has become a lot of foreign tourists to Nanjing's new options. The ecological beauty of "a river of clean water encircled the city" bears in mind a firm and efficient battle to improve the water environment.
To deal with water pollution, the key depends on whether we can control "discharge". Rainwater and sewage pipes stretch underground in nearly 160 neighborhoods in Jiangning. The purpose of rain and sewage diversion is to intercept sewage from the source and promote the water quality of river. This is a "conscience project" under the surface. According to statistics, in 2017 and 2018, Jiangning Urban Construction Group laid about 250 kilometers of rain and sewage branches. At present, Jiangning Urban Construction Group undertakes the diversion of rain and pollution, community environment foundation upgrading tasks have been finished.
The problem is in the water, the root is on the shore. The person in charge of Jiangning Urban Construction Group has calculated an account: Since 2016, Jiangning Urban Construction Group has carried out the construction of main and secondary sewage trunk pipes in Zhalu, Yangjiawei and Dongshan Old City, carefully found out the bottom of the sewage pipe network in the main city, strengthened normal supervision and control, and laid more than 20 kilometers of main and secondary sewage trunk pipes to ensure that sewage does not go into the river.
Insufficient capacity of sewage treatment is a key problem that restricts the overall improvement of water environment. This year, five major sewage treatment projects in Jiangning rapid advance, crack the "sewage siege".
At present, there are 17 sewage treatment plants in the region, with a total design scale of 472,000 tons/day. By 2020, with the completion of the East Sewage Treatment Plant, the fourth phase of the Science Park Sewage Treatment Plant, the second phase of the Airport sewage treatment plant, the second phase of the Binjiang sewage treatment Plant and the second phase of the South District sewage treatment plant of the Development Zone, the sewage treatment capacity of the whole district will reach 800,000 tons/day, make up the historical debt of sewage treatment capacity, and the sewage collection rate of Jiangning area will be reduced to more than 90\%.
As the scale of urban construction in Jiangning continues to expand, the process of urbanization continues to accelerate, urban water consumption continues to increase, and the requirements for the safety of water supply and drainage are also getting higher and higher. The topic of exploring a new mode of integrated management of urban and rural water has been mentioned in an important position.
In the past, in Jiangning Danyang, Hengxi, Lukou, Tongshan, Guli and other rural streets scattered 11 small sewage plants, local sewage treatment nearby. However, most of these small factories are funded by the streets and villages and run by socialized companies, with varying levels of operation.
After deep coordination, at present the whole district 11 rural street small sewage treatment plants have all entered the Jiangning Urban construction Group "water integration project" management system. "Integration of Water Affairs" is a grand blueprint for water affairs management reform: In the future, Jiangning Urban Construction Group will build a regional unified water affairs command center with integrated plant and network operation, realize integrated management and control of water supply and drainage production, operation, dispatching and security, and help water affairs work transform from digital to intelligent.
Comrade in charge of Jiangning Urban Construction Group introduced that in the past two years, Jiangning Urban Construction Group has promoted the construction, operation and maintenance of sewage treatment plant and sewage network in main city area with new technology, new concept and high standard. The "short board" of sewage treatment has been stretched and the water environment in the area has been comprehensively improved. Aiming at the goal of doubling the capacity of sewage treatment by 2020, the Group will scientifically organize the construction of sewage treatment plants according to the established plan and guarantee the construction node by node to ensure the expected progress. When conditions are ripe, the group will also start sludge incineration, sewage dispatching, reclaimed water reuse, tail water wetland and other ecological projects to improve the sewage treatment capacity of the whole region.
Article source: Nanjing Daily