We will continue to systematically address and strengthen weak areas in pollution control and comprehensively and effectively improve urban sewage treatment capacity
Release time:2018-08-02 Views:163
On the afternoon of August 1, Mayor LAN Shaomin made a special research on the treatment of urban sewage.
In the investigation, LAN Shaomin has come to the east sewage treatment plant, Jiangxinzhou sewage treatment plant, field understanding of sewage treatment. In the subsequent urban sewage treatment work forum, LAN Shaomin listened to the city's sewage treatment work progress report, in-depth study of the difficult problems existing in the work. He pointed out that a city's sewage treatment capacity directly determines the effectiveness of water environment treatment and is a key link to win the battle against water pollution. The whole society should enhance the awareness of water saving and environmental protection, and reduce sewage discharge at the source. All relevant municipal departments should improve their understanding, fulfill their work responsibilities, and focus on solving prominent problems affecting the effectiveness of sewage treatment according to the requirements of water environment treatment, effectively promote the overall improvement of sewage treatment capacity, and ensure that the realization of inferior V water bodies will not be brought into the new journey of modernization.
LAN Shaomin requested that the promotion of urban sewage treatment to use systematic thinking, to overcome difficulties, to ensure results. We should promptly formulate drainage plans, revise and complete targeted and operational plans for urban drainage, sewage treatment, and sewage pipe networks as soon as possible, and translate the results of these plans into work plans and targets and tasks as soon as possible, so as to achieve scientific, systematic and precise governance. We need to improve the weak points in sewage treatment, and step up efforts to expand sewage treatment facilities that have already been determined to begin construction at an early date. To solve the problem of partial interconnection between sewage treatment plants and sewage pipe networks, it is necessary to demonstrate scientifically and come up with practical solutions as soon as possible. To improve the shortcomings of sludge treatment, on the one hand, through market-oriented means, actively promote power plant, cement plant, waste power plant and other multi-channel treatment; On the one hand, speed up the improvement of sludge emergency disposal function, pay close attention to site selection and landing, identify the investment subject, and start construction as soon as possible. At the same time, it is necessary to adhere to the functional positioning of environmental protection industrial park, and maximize the role of environmental protection industrial park under the premise of adhering to high standards of construction. We need to improve the weak links of sewage network, and effectively solve key problems such as the lack of main pipe network, the inability to receive sewage along the line, and the direct discharge of sewage from main pipe network. Promote the standardization of drainage, check and repair drainage facilities, and rationally dispatch landscape water level; Strengthen pipe network survey, comprehensive application of survey results, effectively improve sewage treatment efficiency. It is necessary to strengthen the overall coordination and promotion, firmly establish the idea of "one game of chess" in the whole city, adhere to systematic planning, joint promotion and joint governance, improve the systematic arrangement of plans, strengthen the linkage and coordination of departments, accelerate the pace of work, implement the work requirements of "work project, project goal, target node and node responsibility", closely adhere to the target node and increase scientific control. We will ensure that efforts to improve urban sewage treatment capacity are carried out effectively and in an orderly manner and achieve tangible results.
Source: A1, Nanjing Daily, August 2, 2018