Nanjing water to ensure that this year the city to eliminate the black smelly river

Release time:2018-03-28 Views:116

"To improve the water environment is an important part of the city's pollution prevention and control, and the water department has an unshirkable responsibility to shoulder." In the recent held on the bid to find the difference, innovation and practical work, to ensure that this year's work tasks to complete the city's water system work conference, Nanjing Water Bureau Director Zhang Xiaoke said. This year, Nanjing water affairs department will continue to increase efforts in eliminating black and smelly water bodies, tamping flood control engineering system, improving urban and rural sewage treatment capacity and other aspects, and must strive to achieve a significant improvement of Nanjing water environment.


We will make progress in improving the water environment


This year, the department of Water Affairs will complete the project to improve the water environment of 45 rivers in six districts of the southern Yangtze River, carry out the construction of eight important water bodies, including Xuanwu Lake and Qinhuai River, and complete the renovation of eight black and smelly rivers in five new districts. Completed the upgrading of Grade A of Chengbei and Jiangxinzhou sewage treatment plants, and promoted the new renovation and expansion of 6 sewage treatment plants such as Baguazhou; Implementation of water diversion and replenishment and plant network connectivity projects. By the end of the year, the city will basically eliminate black and smelly water bodies.


We will speed up the construction of flood control facilities


In terms of flood control system construction, the Yangtze River bank collapse control and Baguazhou branch regulation construction will be implemented, and the main project of the first phase of the East Qinhuai River will be started, and the main stream of the Qinhuai River, Chuhe River and Shuiyang River will be carried out. We will comprehensively improve the construction of small and medium-sized rivers with weak links in the post-disaster period and key city-level river channels, and promote the improvement of 11 small and medium-sized rivers, including the second phase of the Jiuxiang River, the 800 River and the Gaoyang River. We moved faster to complete the work of preventing and eliminating floods in 42 places and upgrading 18 flooded areas.


We will promote scientific water conservation and water control


In terms of water saving, Nanjing will further implement the strictest water resources management system this year, strengthen water conservation and protection management, and complete the construction of 60 water-saving carriers. We will gradually raise the rate of water quality in key water functional areas to meet standards, and ensure that the quality of centralized drinking water sources meets the standards continuously and steadily. We fully implemented the "river chief system", formulated and implemented the action plan for "Ecological rivers and lakes", and actively coordinated the implementation of the task of "one river and one policy".


We will improve the ability to ensure water supply


In terms of water supply, construction and upgrading of a 100-kilometer water supply network will be completed. Complete the integration and relocation of the water intakes of Chengnan and Pukou Water plants, and promote the advanced treatment of Chengnan and Beihekou water plants; We completed the renovation of low-pressure water supply facilities in 30 old residential areas in the main city.


We actively promoted the construction of key irrigation and water conservancy projects in five districts, including Gaochun and Lishui, and key reservoir-dam reinforcement projects, completed the renovation of 60 rural pumping stations, five small waterlines and six small river basins, and completed the dredging of 18 million square meters of rural rivers and ponds. We will create 15 waterbeauty villages and complete an efficient water-saving irrigation project covering 35,000 mu of land.



Source: Yangtse Evening Post, page A18, March 28, 2018